ioet
← All case studies

High-Bandwidth Data Upload Pipeline

Industry

Healthcare

Engagement

Two-month sprint

Tech stack

React, Angular, Svelte, Vue.js, Preact

Team

Embedded ioet engineers coordinating directly with a second internal engineering team under a fixed deadline.

Challenge

A large South American customer was uploading a growing volume of documents that threatened the platform's stability — the existing system risked buckling under the load, putting the business relationship at risk.

Approach

ioet replaced the existing third-party document upload service with a custom web application, and integrated a new cloud-based document management platform to handle processing and metadata. The team had to build a pipeline capable of handling tens of thousands of files an hour with thousands of concurrent users, coordinate closely with a second, previously unfamiliar engineering team, and ship it all within a two-month deadline.

Results

The team shipped the new pipeline on time, increasing platform capacity 10x — a result the client later featured in its own annual technology presentation as a case study in cross-team collaboration.

ioet's senior engineers work embedded in your team, in U.S. time zones, through staff augmentation, dedicated teams and custom software development. See more case studies.

Want results like this for your team?

Book a 30 minute call